Then bring in more fill from that point and slope it down. The whole reason for all this messing around is that we are in a bowl shaped lot, which has a hundred year water line in it. We have to build 5 feet above that, and can't put any fill below that line.
I tried to draw in what I am thinking they are thinking. The blue line is where I guess the boulder wall will be, the red is the topo's of the fill they will bring in. I am thinking they will do that so that they have a better parking lot for the Parade. There is about a 10 foot difference between where the driveway is and the current grade of the land. So it would probably be about a 10x10 boulder wall. We received a quote from a guy once that was 35 bucks a square foot, so Lighthouse is looking at probably 3,500 for the wall alone. More probably since they are talking about putting in some steps down to the lower level and a sidewalk leading down there...
We will see on Monday what they are really going to want to do. Though I have to say that we have an ideal location for a parade home and a pretty nice design and lot, if I do say so myself.
No comments:
Post a Comment